🏬🏣Several years ago, a tenant was organising a fitout for their new tenancy; they had engaged a mechanical engineer to design their cooling needs in the new space.🏣🏬
The enthusiastic engineer had pulled out the reasonably new existing AC unit, claiming it wouldn’t do the job.
Wanted to remove structural columns on a lower floor of a multi-floor building to pull in fresh air.
Specified a sizeable cooling unit for a 500M2 space.
The total cost to build was 1.5 Million.
Building Facilities reviewed the HVAC fitout for the tenant, we spoke with the engineer, had them leave their desks, and visited the site, where we pointed out the building’s existing features.
They no longer needed to modify the building structure, incorporated the existing ac units, ultimately the project cost was in the vicinity of $100k a $1.4 million saving.
Contact us today at 📱 03 9086 1805 to learn how we can take your asset to the next level.
Contractor Management
BuildingFacilities
FacilityManagement
BuildingOperations
Sustainability
OperationalExcellence
www.buildingfacilities.com.au/